But the issues do not stop there. SCE requires a high level
of synchronisation to be effective, and this is difficult
to achieve, without even considering lean. MRP technology
can be used to perform this role but is prone to instability
if there is insufficient or inaccurate supply and demand data.
Should a crisis arise, it must be dealt with swiftly and
this requires that the system is closely monitored.